Don Amaro – 42 Luxury Villas
The design of Don Amaro is modern and fresh. The horizontal lines, parallel to the sea, create a symmetrical shape, while the vertical lines break that symmetry and give movement to the villa.
Set on 2 levels, this spacious Costa del Sol villa is going to be built using only the finest materials throughout.
3 4 424m² 519 – 654 m²
From 495.000€
Payment Terms
1.- Reservation Fee 50.000€
Bank / insurance guaranteed
2.- Buy the plot
Client becomes the developer
Sign turnkey contract 30.000€
Payment includes:
– Cleaning of the plot if necessary
– Topography study
– Geological study
– Architect project
– 3D images
– Quantity surveyor study
– Health & security study
3.- Start building
20%Once the license has been granted, construction starts.
4.- Monthly payment & Finance
The rest of the payments will be made per month, with all completed
progress demonstrated by building certificates.
Once you have paid the plot, with a good credit history, it is quite
simple to obtain a self-developer mortgage to finance the building
costs.
5.- Completion
Construction completion time of 10-12 months.
Once the villa is finished, we manage the final utility connections
and first occupation license for you.
BENEFITS BUYING OFF-PLAN
- Buy 40% below market price
- Possibility to change internal distribution
- You can decide the finishes
- We take care of the entire project to give you total peace of mind
TAXES
The obligatory applicable taxes are:
- Over the plot: 21% V.A.T.
- Over the building cost: 10% V.A.T.
- Development Companies will NOT pay taxes over building costs
NO ADDITIONAL COSTS
There are NOT aditional costs – everything is covered.
The quote we give you includes:
- All the construction licensing costs
- First occupation license
- Utility connections / final connection fees
- An independent quality control company
- Decennial insurance fees
- Laboratory tests
- Quantity surveyors
- Health and security supervision
- Architect studies
The list goes on – and it´s all included
TRIPLE GUARANTEE
- Up to 10 years structure
- 3 years installations
- 1 year finishes